| |
The objective of the pilot testing is to discover and correct errors prior to ‘going live’, to reinforce the detailed training, to test procedures and to maximize the operational efficiency of MAS 90 through system tuning. To achieve this objective, we perform some of the following activities: verify the system options and settings, test interfaces, check security, test data entry accuracy and test default parameters. |
|